SHRI JAYAM COMPLIANCE GROUP
shrijayamassociates.tn@gmail.com +91 83449 03452 / +91 87785 55795
● Compliance & Safety Specialists
Shri Jayam Associates
Shri Jayam Associates
Training & Environmental Consulting

Environmental & Engineering Consulting Services

TNPCB CTE/CTO consent advisory, EIA studies, ETP/STP design review, and green audit clearances.

Environmental & Engineering Consulting Services

Comprehensive Overview

Navigating complex environmental regulations and securing timely clearances from State Pollution Control Boards (TNPCB / CPCB) requires expert technical advisory. Our consultancy division provides end-to-end guidance for Consent to Establish (CTE), Consent to Operate (CTO) renewals, ETP/STP engineering design reviews, Environmental Impact Assessment (EIA) baseline studies, and industrial green audits.

Applicable Regulatory Standards & Testing Protocols

✓ Water (Prevention and Control of Pollution) Act 1974 ✓ Air (Prevention and Control of Pollution) Act 1981 ✓ EIA Notification 2006 (MoEFCC)

Analyzed Parameters & Test Methods

TNPCB Consent to Establish (CTE) & Consent to Operate (CTO) Documentation
Environmental Impact Assessment (EIA) & Baseline Field Environmental Studies
ETP / STP Process Design Evaluation & Zero Liquid Discharge (ZLD) Optimization
Environmental Audit & Form V Annual Return Preparation
Hazardous Waste Authorization (Form 1) & E-Waste / Plastic Waste EPR Registration
IGBC / LEED Green Building Baseline Environmental Compliance Reports

Sample Intake & Turnaround Protocol

Industrial Plant Site Visit & Technical Scope Review | Turnaround Time: Project-based Timeline

Key Scope & Execution Deliverables

Comprehensive advisory by former PCB officers and certified environmental engineers
OCMMS online application filing and response to PCB clarification letters
Adequacy certificate preparation for industrial pollution control measures
Custom ETP troubleshooting and chemical cost-reduction solutions

Key Business & Regulatory Benefits

Accelerates regulatory approvals, eliminating factory commissioning delays

Prevents costly legal notices, bank guarantee forfeitures, and pollution closure orders

Required Document Checklist

  • Plant Land Documents, Machinery List & Process Flow Chart
  • Existing PCB Consent Copies & Water/Power Sanction Letters